365kW Commercial Installation in South Florida

    365kW Install Sugar Farm in Florida

    The largest sugar manufacturer in the state of Florida is going Green! Go Solar Power recently completed this 365kw solar ground mount to provide stable energy for one of the largest sugar production locations in the southern US. The huge array features over 900 Jinko 405 panels, SMA inverters, and Iron Ridge racking for a sturdy system built to weather the elements of Florida's tropical climate. Installers dug 1,000 feet of trenching around the facility to accommodate for the full system's needs. The clients were very pleased with our team at CED Greentech Miami's prompt and reliable sourcing and delivery of all materials.

    Location

    Clewiston, FL 33440
    United States

    Total size
    365.00kW
    Type
    Commercial
    Energy Storage
    Installed